This includes wood trim and solid wood doors. These are all purchased unfinished, so we have been finishing them with Watco Natural Danish Oil
Most of the light fixtures are now installed and operational, which makes it possible to work into the wee hours of the night. The most recent project was starting the tiling process of the master bathroom.
With the doors out of the way, we setup in the bedroom to measure and cut the cement board as needed. After stapling down a simple vapor barrier, the cement boards are then screwed through the subfloor with masonry screws.
We are using Durock Cement Board
No comments:
Post a Comment