I've been too busy to post lately, so there is quite a bit of catching up to do! For starters, the ceiling of the master shower has been tiled (save one piece - ran out of adhesive!).
We're using a combination of Loctite PL-375 and Loctite Power Grab All-Purpose Construction Adhesive rather than thinset to attach these to the ceiling. Much easier!
Next, we started laying out the hardwood flooring. It is 3/4 inch thick solid Maple.
We got about two thirds of the room nailed down in a weekend. The first rows take quite a while to get perfectly straight. Once you're past that though, things go much quicker with the tongue nailer.
The wood has a nice variety to it:
Tuesday, June 7, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment