Interior walls have been framed, and the rough-in work for plumbing (drains) and electrical work has been started as well.
I will also be running a lot of Cat-6a for computers around the house in the next week or so. For interior walls this is done as usual, but for exterior walls, channels are cut in the ICF so that the wiring lays against the concrete. Scrap pieces will then be placed every foot or so on top of the wiring so it sits along the concrete, away from the drywall.