Wednesday, February 9, 2011

Upstairs progress

Over the weekend, with the help of some wonderful friends, I started to run Cat-6a cabling to various rooms in the house. The runs are complete from the wall location to where they drop through the subfloor to the trusses in the basement. Most of the run will be through these trusses to the eventual patch panel location. I will finish the run once the basement concrete is poured and set.
After that was complete, the ceiling and gable end wall vapor barriers were attached. This will allow some attic insulation to be placed before the drywall, allowing us to start heating this floor sooner. You can see where many of the light fixtures will be in the ceiling.
Fiberglass insulation has been added to the gable end walls as well, behind the vapor barrier. These walls are built thick enough to match the ICF wall, about 10 inches total.